In the recent years our specialists successfully worked on such projects as:

Ore:

• «Kovdorskiy GOK», flotation equipment for iron ore concentration and sulfur removal, 3 mln t/year

• «Kovdorskiy GOK», technology design and supply of gravitation section, 1300 t/hour

• «Kovdorskiy GOK», engineering of new apatite flotation section, 500 t/hour

• «Apatite», reconstruction of flotation section ANOF-2 (foam feeding and concentrate cleaning) 4.2 mln t/year

• «Ammofos», engineering and assembling of horizontal belt filter of 110 square meters (phosphoric acid)

• «Mihaylovskiy GOK», plant for iron ore concentration, 4 mln t/year

• «Polyarniy Quartz», designing of quartz plant

• «Quartzwevrke East», design of concentration technology for glass-making sand factory with 2 modules of 30 t/hour each

• «Shokanskaya Plant», concentration of Ti-Zr sand (Kazakhstan) – technology design for gravitation concentrate separation

• «Ziryanovskuy GOK», and « Ridderskiy GOK» of « Kaztsink», flotation sections reconstruction

• «KMARuda» tailing concentration project

• «Kachkanarskiy GOK» tailing concentration project, technology design, feasibility study

• «Mihaylovskiy GOK» Research and equipment full-scale tests for extraction of oxidized ferrous minerals from tailings after wet magnetic separation

• «Polyus-Gold», «Matrosov Mine» ore concentration plant– technology design

• «Bashmed», «Haybulinskaya PP» EPC contract for 2 thickeners of 9 meter diameter and 4 -12 meters accompanied by the station for flocculant preparation

• «Gomel chemical plant»– engineering and assembling of 110 sq. m. belt filter with

accessories

• «Ammofos» – engineering and assembling of 100 sq. m. horizontal belt filter with accessories

• «Polymetall,» Merril-Crou section at «Kubakinskaya ZIF» – EPC contract

• «Polymetall», Amur hydrometallurgical plant - di sorption, acid cleaning reactivation and

electrolysis sections - EPC contract

• «Magsel» (OVOCA) – processing plant for Stahanovskoye deposit – EPC contract

• «Eurohim», «Volgokaliy» – design and supply of column flotation machines

• «Inguletskiy GOK» – feasibility study and design of thickening section and water treatment of tailings, 85 000 cubic meters / hourîò 2 and 2 thickeners of 115 meter each

Coal:

• Processing Plant «Krasnoarmeyaskaya - Zapadnaya» for «Donetsk stal», 12 mln t/year

• «Raspadskaya», I phase for 11 mln t/year, II phase for additional 3 mln t/year, type «Ê»

• «Kureinskaya», project feasibility study and design for «YujKuzbassUgol»

• «Sibirginskaya» project feasibility study

• «Listvyanskaya» for «Sibantratsit» construction control, equipment supply

• Projects on tailing processing

And the others.

If you have interest in particular area please let us know via info@coralina.ru and we will provide you detailed reference regarding our expertise in the field of your interest.